Industry 4.0 begins with a reliable connection between the physical test and its recorded result. A barcode identifies the unit. The selected test plan maps models and test flows to DUT positions. The sequence produces measurements, decisions and a final status.
At the instrument
Read measurements and responses through configured communication adapters. Preserve enough diagnostic context to investigate a failed step.
At the station
Track current execution, device readiness and production status. Store records for later search and analysis.
At the factory system
Use the agreed MES contract for pre-test validation and result exchange. Map the identity, model and result fields deliberately.
At the supervisor view
Share allowed production summaries and health information through the licensed Smart Factory Monitoring connection.